A major South Korean construction company has been has awarded the contract to build a huge processing plant offshore from Western Australia for the $31.78 billion Ichthys gas project .
Samsung Heavy Industries will build the facility, about the size of a cricket ground, which will extract seawater from the natural gas and divide away the condensate, a type of light oil.
After processing at the plant the gas will be pumped about 900 kilometres from the Ichthys field offshore off Western Australia to Blaydin Point in Darwin to be converted into liquefied natural gas (LNG).
The condensate will be transferred to a floating storage area where most will then be loaded onto boats and exported.
The $2.53 billion contract awarded to Samsung is not the largest contract so far connected with the Ichthys project, which is a collaboration between Japan’s Inpex Corporation and French company Total SA.
A contract to build the $14 billion onshore plant was recently awarded to a partnership of JGC Corporation, Kellogg Brown and Root, and Chiyoda Corporation.
The Ichthys project is expected to pump billions of dollars into the Northern Territory’s economy during the next 40 years.
It will require about 2700 workers during peak construction, with 300 jobs ongoing once it is operational.
First gas exports from the project are expected to commence in late 2016.





